S/4HANA MIGRATION

S/4HANA Migration:
Transform Before the 2027 Deadline

SAP ECC support ends December 31, 2027. MOIT delivers proven S/4HANA migration expertise across Greenfield, Brownfield, and Hybrid strategies—with Data Migration Cockpit mastery, near-zero downtime, and complete support from assessment through hypercare. Transform strategically, not in panic mode.

Get Migration Assessment     Explore Migration Strategies

Key Value Propositions

  • Beat the 2027 Deadline: 2026 is your last comfortable window—avoid resource scarcity and cost inflation
  • Three Proven Strategies: Greenfield (transform), Brownfield (convert), Hybrid (balanced)
  • DMC/LTMC Mastery: Deep expertise in Staging Tables and Direct Transfer approaches
  • Near-Zero Downtime: NZDT migrations protect business continuity
  • Complete Support: From readiness assessment through hypercare—one partner, complete journey

THE 2027 DEADLINE CHALLENGE

Why 2026 Is Your Real Deadline ?

The Migration Imperative

While December 31, 2027, is SAP's official end-of-support date, 2026 is your last comfortable window to migrate strategically. Understanding the data migration process is essential for selecting the right strategy and ensuring successful business transformation.

The Timeline Reality

Timeline What Happens Impact
2026 Last window for strategic migration Control timeline, secure DMC expertise, start early
Dec 31, 2027 SAP ECC standard support ends No updates, patches, or security fixes
2028–2030 Extended maintenance (2% premium annually) Higher costs, limited support, competitive disadvantage
Post-2030 Customer-specific maintenance only Business-critical risk, extreme cost

The MOIT Advantage: We help you start your migration journey now — control the timeline, manage resources strategically, and capture S/4HANA benefits early. Transform strategically, not in panic mode.

Three Migration Strategies

Choose Your Path: Greenfield, Brownfield, or Hybrid

SAP S/4HANA Data Migration Cockpit is used in three migration scenarios. MOIT guides you in selecting the optimal strategy for your business transformation goals

Greenfield

New Implementation

A company is implementing a new S/4HANA system, but historical data has not been fully migrated. Fresh start with process redesign; migrate only clean, relevant data; adopt SAP best practices.

Timeline: 12-18+ months
Best For: Major transformation, heavy customization, cleanup, process reengineering

Hybrid

Selective Data Transition

Companies optimize business processes using a selective transformation: a combination approach—a new system with selective data and targeted redesign.

Timeline: 9-15 months
Best For: Transformation in specific areas, phased migration, risk management
MOIT Advisory: There is no one-size-fits-all approach. The right strategy depends on your transformation ambition, risk tolerance, and timeline. We assess and recommend the optimal path.

Strategy Comparison

Strategy Timeline DMC Approach Best For
Greenfield 12–18+ months Staging Tables Transformation
Brownfield 6–12 months Direct Transfer Quick conversion
Hybrid 9–15 months Both approaches Balanced

Data Migration Cockpit

SAP Data Migration Cockpit: MOIT's Core Competency

Understanding Data Migration
Data migration involves moving data from the source to the target system. SAP organizes business data into migration objects, each representing specific data types. It's essential to assess what data to migrate—manual methods are slow and error-prone. SAP S/4HANA DMC automates this process.

Data Migration Process Overview

Source: SAP Learning

Figure: SAP S/4HANA Data Migration Cockpit Process Flow

The Migration Cockpit automates data migration through five guided steps:

  • Select migration objects,
  • Get data from source systems (SAP Business Suite or Legacy),
  • Map and transform data to reflect custom requirements,
  • Simulate to validate, and
  • Migrate to the target S/4HANA environment (Cloud public/private edition or on-premise).

Migration programs are automatically generated—no programming required.

Evolution: From LSMW to DMC / LTMC

Over the past 50 years, SAP has developed a range of migration tools to address technological change. Data was first moved from R/2 to R/3 via one-time programs, resulting in the Legacy System Migration Workbench (LSMW), which lacks modern automation. Migration Cockpit (LTMC), released in 2016 with SAP S/4HANA 1610, is the contemporary successor — a web-based tool (transaction code LTMC) with predefined migration objects, templates, and SAP Fiori interface.

MOIT’s DMC / LTMC Capabilities
  • Multiple Migration Methods: File-based (XML, CSV, Excel) and direct system transfer
  • Modern Web Interface: SAP Fiori app expertise for user-friendly migration management
  • Pre-Migration Validation: Data quality checks before loading to catch errors early
  • Mass Transfer Expertise: Single Mass Transfer ID for master data across systems
  • Template Acceleration: Proven templates and mapping features speed implementation

Two Migration Approaches

1

Staging Tables Approach

A temporary database table holds data from the source system and resides in SAP S/4HANA DMC. Users select data via template files (XML/CSV) or ETL tools.

MOIT's ETL Tool Expertise:

  • SAP Data Services (DS): Complex migrations, data extraction, and quality enhancement from SAP and non-SAP systems
  • SAP Landscape Transformation (SLT): Real-time data replication and transformation during mergers and system conversions
  • SAP HANA Smart Data Integration (SDI): Continuous data replication from multiple non-SAP sources to the target system structure

Best For:

  • Non-SAP source systems (Oracle, SQL Server, etc.)
  • Complex data transformations required
  • All deployment options: on-prem, public cloud, private cloud
  • Data cleansing needed before upload
  • 210+ migration objects are sufficient
2

Direct Transfer Approach

Introduced in S/4HANA 1909 release for ABAP-based source systems. MOIT creates an RFC (Remote Function Call) connection between source and target systems (primarily SAP ERP). Migration Cockpit automates data provisioning in the source system. Not a 1:1 process—MOIT ensures proper data mapping and transformation.

Best For:

  • SAP source systems (ECC 6.0, ECC 7.0, R/3)
  • On-premise and private cloud deployments
  • Automated data extraction preferred
  • 250+ migration objects needed
  • Brownfield (system conversion) migrations

MOIT’s Decision Framework

Factor Staging Tables Direct Transfer
Deployment All options (on-prem, public/private cloud) On-prem and private cloud only
Source System Any ERP (SAP & non-SAP) SAP systems only
Data Provisioning User: XML, CSV, ETL tools DMC: RFC automated
Data Cleansing Before upload — clean data only At the source system
Migration Objects 210+ objects 250+ objects

MOIT’s Expertise: We assess your source systems, data quality, deployment model, and timeline to recommend the optimal DMC approach — or a combination of techniques — for your specific migration scenario.

MOIT'S Migration Services

Complete S/4HANA Migration Support

Migration Readiness Assessment

Current landscape analysis, SAP Readiness Check, data volume assessment, strategy selection (Greenfield/Brownfield/Hybrid), DMC approach recommendation (Staging vs Direct), effort and cost estimation, business case development

Data Migration Execution

Data classification (hot/warm/cold), cleansing and validation, DMC/LTMC configuration, template creation for Staging Tables OR RFC setup for Direct Transfer, ETL tool integration (Data Services/SLT/SDI), mass transfer with single Transfer ID, migration testing and reconciliation

Custom Code Migration

ABAP Test Cockpit analysis, Custom Code Migration app, code remediation for S/4HANA simplifications, Clean Core A-D compliance, unit and integration testing

Technical Migration & Infrastructure

S/4HANA system setup (on-prem or cloud), HANA database migration, near-zero downtime (NZDT) strategies, integration configuration, and infrastructure optimization

Process Redesign (Greenfield/Hybrid)

Process analysis and optimization, SAP Activate methodology, fit-to-standard design, configuration, and end-to-end testing (for transformation projects)

Change Management & Training

Stakeholder engagement, communication strategy, role-based training, user documentation, adoption support, hypercare (4-8 weeks post go-live)

Why Choose MOIT

The MOIT S/4HANA Migration Advantage

DMC/LTMC Mastery

Deep expertise in both Staging Tables and Direct Transfer approaches. ETL tool integration specialists (Data Services, SLT, SDI). Proven templates accelerate implementation over 70%.

Proven Track Record

50+ successful S/4HANA migrations for cable, telecom, and manufacturing clients. Near-zero downtime implementations with proven methodologies. Zero data integrity failures.

2027 Deadline Urgency Understanding

We know 2026 is the absolute deadline. Help you start now to avoid resource scarcity, cost inflation, and rushed implementation. Strategic transformation, not panic mode.

Clean Core Compliance

Expertise in SAP's 2026 Clean Core A-D extensibility model. Future-proof your system for smooth upgrades, lower TCO, and innovation readiness.

Complete Migration Support

From readiness assessment through hypercare—one partner, complete journey. Data migration, custom code, testing, training, and go-live support.

Business Value Focus

We don't just migrate systems—we transform businesses. Real-time analytics, process automation, competitive advantage. Measurable ROI beyond compliance.

Our Approach to Mill Products Solutions

Sales: Vehicle Customization & Customer Lifecycle

For Sales, we create and support processes and tools to customize vehicles. These processes integrate with pricing, promotions, and customer lifecycle management (CRM) to ensure customer satisfaction.

Key Capabilities:

  • Variant Configuration: Configure products based on customer specifications with real-time pricing
  • CRM Integration: Seamless customer lifecycle management from inquiry to delivery
  • Pricing & Promotions: Automated pricing calculations with promotional programs
  • Order Management: End-to-end order processing with availability checks

Supply Chain: Manufacturing, Logistics & IT Integration

The Supply Chain is complex and evolving. Integrating manufacturing, logistics, and IT through e-business is essential to the global vehicle market. Industry experts who leverage technology can streamline operations, reduce costs, and enhance customer service.

Integration Approach:

  • Manufacturing Integration: Connect production planning with shop floor execution
  • Logistics Optimization: Streamlined material flow from procurement to delivery
  • IT Systems Integration: Electronic business capabilities for global operations
  • Cost Reduction: Technology-driven efficiency improvements

After Sales & Warranty Management

After-sales and warranty management are key to retaining customers. We prioritize customer satisfaction by offering mobile access to check part status and warranty coverage. This boosts satisfaction and fosters more effective and profitable business, reflecting our commitment to your customers.

Service Features:

  • Mobile Access: Real-time part status and warranty information on mobile devices
  • Warranty Management: Complete warranty tracking and claims processing
  • Customer Satisfaction: Enhanced service experience driving retention
  • Profitability: Efficient service operations improve business results

Mill Industries Expertise

Primary Focus: Automotive & Wire & Cable

MOIT specializes in delivering SAP Mill Products solutions for the Automotive and Wire & Cable industries, with comprehensive capabilities across the broader mill products sector.

  • Automotive

    Vehicle customization, variant configuration, supply chain integration, after-sales warranty management, and dealer network support.

  • Wire & Cable

    Length-based material management, coil processing, cut-to-length operations, specialized logistics, and cable manufacturing optimization.

  • Metal Processing
    Non-ferrous metal processing, rolling mill operations, extrusion, finishing, and metal trading capabilities.
  • Paper & Textiles
    Area-based material management, roll handling, converting operations, and specialized inventory tracking.
  • Construction Materials
    Building materials processing, concrete products, cement manufacturing, and distribution management.
  • Wood Products
    Lumber processing, panel production, dimension tracking, and yield optimization for wood manufacturing.

Frequently Asked Questions

Q1: What happens after December 31, 2027?

A: SAP ECC standard support ends. No updates, patches, or security fixes. Extended maintenance available until 2030 (2% premium annually) with limited support, or customer-specific maintenance post-2030 at extreme cost.

Let Us Co-Innovate Together, Say Hello

Ready to migrate to S/4HANA before the 2027 deadline? MOIT delivers proven expertise in Greenfield, Brownfield, and Hybrid strategies, with mastery of DMC/LTMC. Start your migration journey today—control your timeline, transform strategically, capture business value early.